Stairs from Base to deck 1

Here is the stairs to deck #1. There are 19 steps. I designed this stairs on ACAD. I laid out the pattern on 2X12 X20 pieces of PT lumber and cut the steps. Everything fit like a glove.

Monday, July 16, 2007

Egg House

Last weekend I installed a picket fence in from of the little egg house. Kathy started painting it but it's not finished. The house was just repainted.

Sunday, July 15, 2007

Now the deck is finished. I had request form my mastermind group that I be hold accountable to have this deck built on or before 7/17/07. The group drives each other to clarify what each one desires. Then they stand by while each of us complete what we said we wanted. I'm very grateful that I have the three other individuals in my mastermind group to push me forward without a word.

Next I need to build the stair case from base camp to lower deck #1.
Now the deck is half decked in. The is the first of three more decks. I estimate it will take two to three more decks each one twenty feet lower than the order to reach the bottom.
Now you see the 2X6 floor joist go in to support the 2x6 decking. I've started the 1st deck board in the west side of the deck.