
I have started the foundation of the second deck on my way down to the bottom of the property. This deck is approximately 20" below the base camp deck. I cleared the side of the steep hill and set four 4X4 for the support and 2x8 PT around the parameter for strength. I used cross bracing to unsure stability.
No comments:
Post a Comment